SDS Posted March 14, 2022 Report Posted March 14, 2022 Senator Chuck Schumer in Buffalo today, mentioning that money from the latest federal spending bill will be used to directly connect KeyBank Center with the DL&W Terminal via some sort of tunnel. Off the train and into the arena without going outside. 4 Quote
Stoner Posted March 14, 2022 Report Posted March 14, 2022 https://en.wikipedia.org/wiki/DL%26W_station 1 Quote
LGR4GM Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 3:33 PM, SDS said: Senator Chuck Schumer in Buffalo today, mentioning that money from the latest federal spending bill will be used to directly connect KeyBank Center with the DL&W Terminal via some sort of tunnel. Off the train and into the arena without going outside. Expand I'll believe it when I see it. They still haven't gotten the train to UB north campus 2 Quote
Indabuff Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 5:33 PM, PASabreFan said: Mole people. It's real. Expand 2 Quote
PromoTheRobot Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 5:33 PM, PASabreFan said: Mole people. It's real. Expand Terry found them on one of his drillings. 1 Quote
JohnC Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 3:33 PM, SDS said: Senator Chuck Schumer in Buffalo today, mentioning that money from the latest federal spending bill will be used to directly connect KeyBank Center with the DL&W Terminal via some sort of tunnel. Off the train and into the arena without going outside. Expand With the Seneca One project completed, the proposed DL&W Terminal and the north aud block proposal (see link) you can start to see that once barren area repopulated with social and business activity included to the mix. Momentum added to previous momentum. That's a good sign. https://www.wkbw.com/news/wny-development/proposal-for-redeveloping-the-north-aud-block 1 Quote
woods-racer Posted March 14, 2022 Report Posted March 14, 2022 Is there a reason for wanting that tunnel? Quote
Mustache of God Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 6:53 PM, woods-racer said: Is there a reason for wanting that tunnel? Expand I read somewhere that is has something to do with the mole people. Quote
woods-racer Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 6:56 PM, Mustache of God said: I read somewhere that is has something to do with the mole people. Expand Has to be. An elevated walkway that is partially enclosed to break most of the wind would be much cheaper to build and maintain. Quote
PromoTheRobot Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 7:04 PM, SwampD said: Buffalo folk gettin' soft. Expand I have a vivid memory from a few years ago walking to Key Bank under One Seneca during gale coming off the lake. I got blown down and I'm not small. 1 Quote
Brawndo Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 6:53 PM, woods-racer said: Is there a reason for wanting that tunnel? Expand On 3/14/2022 at 7:00 PM, woods-racer said: Has to be. An elevated walkway that is partially enclosed to break most of the wind would be much cheaper to build and maintain. Expand The Buffalo News is reporting it will be an Enclosed Bridge 2 Quote
Stoner Posted March 14, 2022 Report Posted March 14, 2022 So if they're connecting the arena to a tunnel that means a tunnel to a tunnel. Who creates a network of tunnels like that? You know who does that. Quote
PromoTheRobot Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 7:52 PM, PASabreFan said: So if they're connecting the arena to a tunnel that means a tunnel to a tunnel. Who creates a network of tunnels like that? You know who does that. Expand 1 Quote
K-9 Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 7:14 PM, PromoTheRobot said: I have a vivid memory from a few years ago walking to Key Bank under One Seneca during gale coming off the lake. I got blown down and I'm not small. Expand Quote
Eleven Posted March 14, 2022 Report Posted March 14, 2022 On 3/14/2022 at 7:00 PM, woods-racer said: Has to be. An elevated walkway that is partially enclosed to break most of the wind would be much cheaper to build and maintain. Expand TBN says it will be an elevated walkway, but possibly fully enclosed. https://buffalonews.com/news/local/skybridge-from-dl-w-terminal-to-keybank-center-among-buffalo-projects-to-be-financed-by/article_5317d9bc-a3ae-11ec-ade2-6b6a2c1178ca.html#tracking-source=home-top-story Paywall, of course. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.