In other news, after that last Jersey goal, I got another coat of oil finish on my countertops. So at least the night isn't a total loss.
I'm back for the good part though, where the Sabres roll over the Devils in the 3rd.
Attending to some butcher block details. I put a coat of oil finish on last night, will do another tonight. I made an appointment with the plumber to come out and connect the sink on Friday.... then the kitchen will be functional again!
Still to do after that on Phase I:
Finish putting the doors, drawers and shelves into the cabinets
Adjust all doors and drawer fronts so that they're straight
Install toe kicks and other trim items
Prime/seal the backsplash area
Put up the tile backsplash (considering hiring that out)
Phase II (replace the corner pantry cabinet at the other end of the room):
Remove the corner pantry cabinet
Repair drywall as necessary and paint
Extend plank floor to area where pantry cabinet sits
Move the electrical switch and plug
Put up the IKEA cabinets
Phase II should be a small fraction of the effort of Phase I